EMC Services is committed to providing our clients with quality construction at a competitive price.  EMC Services works hard at being cost conscious without jeopardizing the quality and personal desires of the client.
  
From your vision at the beginning of the project, we will determine a budget and fit the design and construction requirements to fall within those guidelines.  No need for "value engineering" at the end of the design process as this takes place along the way, saving the owner time and dollars.  

As often as possible, EMC self-performs critical portions of its construction projects, including Civil, Structural, Mechanical and Electrical. We have the skilled labor, specialized equipment and hands-on experience to get the job done correctly, right from the start. By self-performing this essential work, EMC maintains better control of the schedule and sets the standard of craftsmanship for the entire construction project.

The most important driver of cost, quality and performance for a construction project is how the project is managed and this is where we excel.  Our team of experienced engineers, designers, and project managers enables us to achieve cost efficiencies and timely completion on every project.

From project conception through construction completion, we have the services and expertise to complete your project successfully!


Quality Construction
Competitive Price
With a $7.8 million budget, EMC Services completed the Design/Build of this structural steel fabrication facility in less than 6 Months and 500,000 Under Budget
Project Information:
  • 20 Acre Site
  • 141,000 sq. ft of Manufacturing
  • 10 Overhead Cranes
  • 22 Jib Cranes
  • 22 Automatic Welding Stations
  • 2 Detention Ponds
  • 121,000 sq. ft of Paving
  • 143,00 sq. ft of Manufacturing
  • 11, 000 sq. ft of office building

Press the play button right to view monthly progress of this project.

Two Projects That Exemplify EMC Services' Capabilities
Project Completed in less than 6 months and $500,000 UNDER BUDGET
Design/Build Manufacturing Facility Including 35’ Deep Foundation to Support 10,000 Ton Press
Left - foundation preparation. Above - press inside completed building.
Project information:
  • $2 million Design/Build Project
  • 200 acre Site
  • 35 ft. Deep Press Foundation with a 10 ft thick base
  • Dewatering for Excavation
  • 1 Detention Pond
  • 24,000 sq ft of Manufacturing Facility with a 65 ft eave
  • 30,000 sq ft of Paving
713-671-9130